DanvilleRecruiter Since 2001
the smart solution for Danville jobs

Set Up Technician (2nd Shift)

Company: Rosti
Location: Cary
Posted on: January 4, 2026

Job Description:

Summary: Under the direction of the Shift Supervisor and Process Technician, the Set-Up Technician is responsible to install and remove molds and organize area to meet schedule requirements. Minimize operation “down-time” with proper preparation and positioning of all required items. Duties & Responsibilities: Ability to perform all duties of Material Handler Mold installation; complete to the point of Process Tech being able to start production Mold removal; complete disconnect, prep for storage, etc. Organize job operation work area Direct Material Handler to assist where needed Monitor IQMS Schedule to support timely start/completion of job Perform other duties as required Training Requirements (OJT 90 Days or less): Ongoing, informal, evaluation by Management for additional training needs. Work Experience: Minimum six (6) months knowledge and experience in Material Handler position Knowledge of IQMS and ability to navigate system to perform job functions Compensation details: 15-20 Hourly Wage PIb937685704bb-25448-39245693

Keywords: Rosti, Danville , Set Up Technician (2nd Shift), Engineering , Cary, Virginia


Didn't find what you're looking for? Search again!

I'm looking for
in category
within


Log In or Create An Account

Get the latest Virginia jobs by following @recnetVA on Twitter!

Danville RSS job feeds